To the newly constructed buildings of the cafeteria and toilets, drinking water connections, sewage sewerage and storm water sewerage lines were made in the length of about 450 m. In the area of the rest area, storm water drainage, paved areas, a wooden shelter and the cafeteria and toilet buildings themselves were constructed. The paved areas and the construction of a bus turnaround with a bus stop were also carried out.

en_GB