Reconstruction of storm sewer - reroute and connect to existing sewer under full operation. The reconstruction was carried out from PP pipe DN800 in the length of 50 m.
Reconstruction of storm sewer - reroute and connect to existing sewer under full operation. The reconstruction was carried out from PP pipe DN800 in the length of 50 m.