Continuation of the second stage of the construction of the sewerage system in the village of Čimhová. The sewer was realized in the road of II. class , which passes through the village Čimhová in the length of 350 m.
Continuation of the second stage of the construction of the sewerage system in the village of Čimhová. The sewer was realized in the road of II. class , which passes through the village Čimhová in the length of 350 m.