Implementation of water supply relocation on the new section of the D3 motorway Čadca, Bukov-Svrčinovec. It was a total of 16 construction objects. The delivery included water meter shafts, valve shafts and overpressures under the railway. The total length of the pipelines to be laid was 2.4 km.

en_GB